- Observed:
- Actual BDR time is 8.9 pp below the approved plan for a high-priority territory.
- Possible explanation:
- Time may have drifted to territories with easier engagement, or research inventory may be thin.
- Investigate:
- Check account inventory and research backlog before changing next period’s plan.
AE Coverage
Am I allocating BDR time and pipeline generation effectively across the supported Account Executives? A resource allocation tool, not an AE leaderboard: unequal distribution is expected when priorities, territories and capacity differ.
Cohort conversion · 31 Aug 2026 – 28 Nov 2026. Time allocation uses AE-attributable activity minutes; shared system and operations time is excluded.
AE contribution
Click an AE to open the coverage drill-down. Planned allocation is the approved input; everything else is calculated from records.
| AE 01 | UK & Ireland (illustrative) · EMEA | 55 | 55 | 8 | 5 | 62.5% | 9.1% | 35.3 | 7.1 | 11.7% | 9.8% | -1.9 pp | 0 |
| AE 02 | DACH (illustrative) · EMEA | 65 | 65 | 7 | 4 | 57.1% | 6.2% | 36.8 | 9.2 | 10% | 10.2% | +0.2 pp | 1 |
| AE 03 | Nordics & Benelux (illustrative) · EMEA | 35 | 35 | 6 | 3 | 50% | 8.6% | 21.9 | 7.3 | 15% | 6.1% | -8.9 pp | 1 |
| AE 04 | Southern Europe (illustrative) · EMEA | 60 | 60 | 5 | 3 | 60% | 5% | 35.2 | 11.7 | 10% | 9.8% | -0.2 pp | 0 |
| AE 05 | US East (illustrative) · North America | 60 | 60 | 5 | 2 | 40% | 3.3% | 38.3 | 19.1 | 10% | 10.6% | +0.6 pp | 2 |
| AE 06 | US West (illustrative) · North America | 55 | 55 | 4 | 2 | 50% | 3.6% | 28.7 | 14.4 | 9% | 8% | -1 pp | 0 |
| AE 07 | Canada & US Central (illustrative) · North America | 60 | 60 | 4 | 2 | 50% | 3.3% | 34.7 | 17.4 | 8% | 9.6% | +1.6 pp | 0 |
| AE 08 | ANZ (illustrative) · APAC | 60 | 60 | 4 | 1 | 25% | 1.7% | 35.5 | 35.5 | 9.3% | 9.9% | +0.6 pp | 2 |
| AE 09 | Singapore & SEA (illustrative) · APAC | 95 | 95 | 3 | 1 | 33.3% | 1.1% | 68 | 68 | 8% | 18.9% | +10.9 pp | 1 |
| AE 10 | Japan & Korea (illustrative) · APAC | 55 | 55 | 2 | 2 | 100% | 3.6% | 25.7 | 12.9 | 9% | 7.1% | -1.9 pp | 0 |
Source · activities · ae_allocations (approved) · outcome_events replay · simulated dataset
Planned versus actual
Planned allocation is an input; the comparison series is a calculated outcome. Equal shares are not the goal. Scope check: planned share averages the approved 30-day allocation periods that start in the selected window, and actual share uses activity in that same window, so both cover comparable periods.
Largest gaps: AE 09 +10.9 pp · AE 03 -8.9 pp · AE 01 -1.9 pp
Coverage diagnosis
Observation and possible explanation are kept apart. Poor conversion of BDR-generated meetings is never attributed to the AE; each scenario suggests an investigation, not a reallocation.
- Observed:
- 4 qualified meetings but 25% accepted (overall 52.1%).
- Possible explanation:
- Qualification criteria, play fit or AE capacity may differ from the BDR’s standard; this is not evidence of AE performance.
- Investigate:
- Review rejection reasons together with the AE and align on acceptance criteria.
- Observed:
- 3 qualified meetings but 33.3% accepted (overall 52.1%).
- Possible explanation:
- Qualification criteria, play fit or AE capacity may differ from the BDR’s standard; this is not evidence of AE performance.
- Investigate:
- Review rejection reasons together with the AE and align on acceptance criteria.
- Observed:
- 55 activated accounts and 2 qualified meetings in scope.
- Possible explanation:
- Too few outcomes to separate signal from noise.
- Investigate:
- Hold the current allocation; review again at the next milestone.
Resource allocation planning
Approved allocation (current input) is shown separately from proposals. Proposals must total 100% for their period and are recorded with rationale and timestamp; applying them is part of the later approval workflow.
Proposed changes (0)
No proposals recorded.
Source · ae_allocations (approved inputs) · decision_log (proposals, append-only)